Delivering results for transportation planning, plans, policies, and projects
We recognize the transportation industry must build and evolve to meet the demands of growing populations and economic needs. That’s why we strive to support public and private clients in visionary transportation projects built on solid and thorough analysis and information. TransLink provides focused management experience and transportation planning expertise
Projects
2028 Games Mobility Concept Plan (MCP) - Los Angeles County, CA
MEGA-EVENT TRANSPORTATION PLANNING
TransLink has supported multiple workstreams for the anticipated Los Angeles 2028 Olympic and Paralympic Games by conducting initial planning efforts for Metro’s MCP, including operational strategies, advancing potential legacy projects and grant writing, and accessibility elements for the Games. TransLink also developed operational strategies for the Games Enhanced Transit System (GETS) to address anticipated spectator and workforce transport.
Eastside Phase 2 Transit Corridor – Los Angeles County, CA
ADVANCING ENVIRONMENTAL COMPLIANCE
To support the extension of the Metro E Line light rail transit (LRT) in East Los Angeles, TransLink prepared sections of the environmental assessment (CEQA and NEPA), including the early planning work (e.g., alternatives analysis) and transportation impact technical reports. TransLink was responsible for developing the project’s purpose and need, alternatives, and transit and parking sections. The EIR was finalized and approved in 2024.
Metro Coordinated Plan Update – Los Angeles County, CA
TAILORING SOLUTIONS FOR COMMUNITIES
TransLink served as a Prime Consultant for Metro’s Coordinated Plan, a federally required plan for FTA Section 5310 transportation funding for seniors and persons with disabilities. TransLink managed the 9-month project, developing technical information and analysis, and facilitated outreach efforts on transportation needs and preferences across LA County. This project was successfully delivered on time and within budget for both plan updates in 2021 and 2025.
North Hollywood to Pasadena BRT – Los Angeles County, CA
USING EVALUATION TO SCREEN ALTERNATIVES
This 16-mile Bus Rapid Transit (BRT) corridor will connect the San Fernando and San Gabriel Valleys with faster transit service between LA’s North Hollywood and Pasadena communities. TransLink evaluated potential stations along the corridor using criteria related to transit-oriented communities (TOCs), land uses, First/Last Mile (FLM), and population/employment densities. This information was used to support the screening of station locations. A locally preferred alternative (LPA) for the Project was approved in April 2022.
Vermont Transit Corridor – Los Angeles County, CA
ADDRESSING TRANSIT & PARKING CONCERNS
Operating along 12.4 miles of Vermont Avenue in Los Angeles, the Bus Rapid Transit (BRT) locally preferred alternative (LPA) will improve access to opportunities and enhance connections to the regional transit network. Using a data-driven analysis approach, TransLink was responsible for technical assessments to understand project implications on ridership, parking dependencies, and station access for communities along the corridor. The Metro Board approved an LPA in 2025.
SGV Transit Feasibility Study – Los Angeles County, CA
WORKING THROUGH TRANSIT FEASIBILITY
In collaboration with the San Gabriel Valley Council of Governments (SGVCOG), TransLink supported a comprehensive plan of short-term transit upgrades and future long-term visioning projects for SGV’s 31 cities and unincorporated LA County communities. TransLink drafted key informational documents for the study, including the executive summary, initial screening report, project definition report, comparative evaluation report, and community outreach report.
Southeast Gateway Line (formerly WSAB) – Los Angeles County, CA
- DELIVERING LARGE CORRIDOR TRANSIT PROJECT The Southeast Gateway Line (formerly known as WSAB) is a 20-mile corridor connecting downtown Los Angeles to Artesia. TransLink has been involved from the early planning stages in 2015 to the ground-breaking for pre-utility work in October 2024. Responsible for planning and evaluating project alternatives, TransLink developed the study corridor and mobility problem definition reports, supported stakeholder coordination activities, and authored multiple chapters of the EIS/EIR. The Metro Board approved the Final EIS/EIR in 2024.
City of Charlotte’s Strategic Mobility Plan - Charlotte, NC
STRATEGIC VISION & MULTIMODAL SOLUTIONS
The Charlotte Strategic Mobility Plan (CSMP) defines a 5- to 10-year strategic vision to enhance mobility and leverage transportation investments to support community goals. TransLink was responsible for project initiation and management, definition, vision and strategy, prioritization and evaluation, and reporting. As part of Charlotte’s Future 2040 Comprehensive Plan, TransLink led community and stakeholder engagement in identifying bikeway and greenway connections based on safety, connectivity, and demand.
New South End Light Rail Station Design – Charlotte, NC
EVALUATING TRANSIT STATION DESIGN
Along the Charlotte Area Transit System (CATS) light rail LYNX Blue Line (South Corridor), a new South End Station is being designed to expand service and access to local communities. TransLink served as the Planning Lead for the station alternatives, presenting a thorough assessment of three potential station locations. Recommendations were based on stakeholder and public feedback and included land use compatibility, safety, access, connectivity, operations, constructability, and costs to address the community vision and goals.
Key Clients:
- Los Angeles County Metropolitan Transportation Authority (Metro)
- Southern California Association of Governments (SCAG)
- Southern California Regional Rail Authority (Metrolink)
- Los Angeles County Department of Public Works (LADPW)
- Foothill Extension Authority
- Orange County Transportation Authority (OCTA)
- San Gabriel Valley Council of Governments (SGVCOG)
- California High Speed Rail Authority
- Metropolitan Transportation Commission (MTC)
- CA cities of Redondo Beach, Anaheim, Chino Hills, La Mesa, Malibu, Santa Monica, West Hollywood, Whittier
- North Carolina Department of Transportation (NCDOT)
- Charlotte Area Transit System (CATS)
- Charlotte Regional Transportation Planning Organization (CRTPO)
- NC cities of Charlotte, Durham, Greensboro
Representative Projects:
- Metro Coordinated Plan Update 2021-2024 and 2025-2028 (Prime)
- Metro Arterial Performance Measurement Pilot (Prime)
- Metro Rideshare and Ridership Study (Prime)
- Metro Transportation Planning Bench 2018 & 2023 (Prime)
- Metro Gender Action Plan
- Metro 2028 Olympic and Paralympic Games Mobility Concept Plan
- Metro Vermont Transit Corridor Project
- Metro D-Line Subway Extension Mitigation Study
- Metro Sepulveda Transit Corridor Project
- Metro North Hollywood to Pasadena Bus Rapid Transit Draft EIR
- Metro North Hollywood-Burbank-Pasadena Rail Feasibility Study
- Metro Los Angeles-Glendale-Burbank Corridor Feasibility Study
- Metro Vermont Transit Corridor South Bay Ext. Feasibility Study
- Metro Rail-to-River Segment B Alternative Analysis
- Metro Orange Line Speed Evaluation Study
- Metro Orange Line Grade Separation Analysis and Operational Improvements Technical Study
- Metro West Santa Ana Branch/Eastside Phase 2 Connection Study
- Metro Southeast Gateway Line Environmental Study
- Metro Eastside Phase 2 NEPA/CEQA Studies
- Metro Grant Funding Support
- Metro Regional Planning and Environmental On-Call
- Metro Shared Mobility ITS On-Call Support Services
- Metrolink Planning On-Call Services
- Metrolink System Mapping
- Metrolink Service Growth Development Plan
- Metrolink Schedule Integration Study
- San Gabriel Valley COG Transit Feasibility Study
- SANDAG Planning On-Call
- California High Speed Rail - Palmdale to Burbank Segment EIS/EIR
- MTC Parking Planning Assistance
- NCDOT Integrated Mobility Division (FAST 2.0) Study
- NCDOT Federal Grants Assistance
- CRTPO Planning On-Call
- CATS Silver Line Rail Trail Study
- CATS Silver Line TOD Study
- CATS LYNX New South End LRT Station Design
- Charlotte Moves Strategic Mobility Plan
- Charlotte Redevelopment & Environmental Assessment
- Charlotte Safe Routes to School Plan
- Durham Multimodal Competitive Grants
- Greensboro ADA Operational Analysis
TransLink has supported signature transit projects ranging from $2 billion to $15 billion.